NAED is beginning construction of a long planned project to install a new “express” distribution line from Landry Ave to North Washington St. This new circuit designated as “Circuit E16” will utilize NAED’s retired 69kV corridor that once served the Whiting Street Substation (Currently DPW Offices). Construction is planned to start on 08-07-2023 and will take a few months to complete. The circuit will provide both redundancy and electrical load relief to the northern part of Town, and provide additional options in the event of certain outages.